Aizawl (15_aizawl)
Mizoram · District Intelligence · 2024
Political Representation
Aizawl — Front Runner District, Mizoram
Aizawl (Mizoram) ranks as High Performer with a composite score of 66.2. Development is gradually improving, with Water as the leading sector and Infrastructure requiring prioritised attention.
Aizawl (Mizoram) ranks as High Performer with a composite score of 66.2. Development is gradually improving, with Water as the leading sector and Infrastructure requiring prioritised attention.
Health score of 80.1 (Front Runner) reflects strong institutional delivery coverage at 93%. Child health shows good child nutrition outcomes (stunting: 20%), with IMR at 3 per 1,000 births.
Education performance scores 60.8 (Emerging). School enrollment is growing but dropout rates and infrastructure quality need attention.
Infrastructure score 50.0 (Emerging): electrification at 92%. Targeted investment in physical connectivity and basic services needed.
Water & Sanitation scores 100.0 (Front Runner). Tap water access and sanitation coverage demonstrate strong JJM and SBM implementation.
Energy score 55.1 (Emerging): household electrification at 92% under Saubhagya. Strong electrification with last-mile connections ongoing.
Agriculture performance scores 50.0 (Emerging). Agricultural productivity is moderate with potential for improvement through irrigation and inputs.
Historical profile pending for Aizawl, Mizoram.
Sources: Census of India · ASI district handbooks · State Gazetteers